Most bathroom remodels start with demolition down to the studs around the tub or shower. That's when we find out what's really there: old water damage, outdated plumbing, or framing that needs straightening before new walls go up.
Next comes the part you'll never see again: cement backer board or foam panels, and a waterproof membrane over every wet surface. Paint-on or sheet membranes stop water from reaching the framing, which is what keeps a shower from leaking into the room below years from now.
Then the visible work begins. Wall tile is laid out from center lines so cuts are even at both corners, niches are framed and waterproofed, and floor tile is set flat with consistent grout lines. Large-format porcelain and marble-look tile are popular choices because they're durable and easy to clean.
Vanities, fixtures, glass, paint, and trim finish the room. A straightforward bathroom remodel typically takes a couple of weeks once materials are on site. Choosing your tile, vanity, and fixtures before demolition is the best way to keep the schedule moving.